Buying New: Ongoing Constructions in 2024-2025 in Villars-sur-Ollon

18 November 2024

| News of Villars

Currently, six construction projects are underway in Villars-sur-Ollon, including three residential buildings located in close proximity to the gondola lift departure point, scheduled for completion in 2025.

These projects, which involve demolitions and reconstructions with expansions or increased density on built-up plots, are proving to be highly successful. They reflect the strong demand for modern properties featuring non-fossil heating systems and low operating costs, which offer the added advantage of eliminating the need for constant renovations. In fact, condominiums (PPE) built between 1970 and 1990 often require repeated interventions (roofs, plumbing, exterior insulation, windows, heating systems, facades, elevators, access ramps, among others).

These new constructions also confirm a price per square meter of approximately 11,000 to 12,000 CHF for new properties, especially those well-located: close to the ski slopes, near the town center, and away from noise disturbances.

To help you get a clearer picture, here’s an overview of the ongoing construction projects:

panorama constructions en cours villars sur ollon achat neuf

New appartments and chalets for sale in Villars-sur-Ollon, to Be Delivered Between 2024 and 2025

1. Petit Florian Apartments (4 Apartments for Primary Residence)

appartement neuf villars sur ollon Petit Florian A
appartement a vendre petit florian B exterieur Only “Apartment A” remains available!
A magnificent 4-bedroom triplex with a double garage box. A true ski-in/ski-out property.
More information on our website: https://www.gerance-service.ch/biens-immobiliers/?id=4780649

2.Chalet Jolimont 1 (2 Apartments for Primary Residence and 1 for Secondary Residence)

appartement en construction Benedictappartement à vendre neuf villars sur ollon Jolimont appartement à vendre neuf villars sur ollon Jolimont

The attic apartment is already sold. Remaining options include:

  • A 5-bedroom apartment (190 m²) on the 1st floor for primary residence.
  • A stunning duplex ground-floor apartment (191 m²) with convertible basements, available for secondary residence purchase and for non-resident foreigners. A unique opportunity!

More details: https://jolimont1.ch/

3.Benedict Residences (2 Buildings with 6 and 7 Apartments for Primary Residence, and a Semi-Detached Chalet for Secondary Residence)

appartement à vendre neuf villars sur ollon benedict appartement à vendre neuf villars sur ollon benedict

Except for a charming 2-room apartment of 41 m², with a garden, located on the ground floor of Building B (reference: Apartment B000), everything has already been sold.

The existing chalet on this plot, now converted into a semi-detached chalet with two units, has just been put up for sale: https://www.residences-benedict.ch/logements.php

4. Hedonia Buildingappartement neuf a vendre villars sur ollon hedoniaappartement neuf a vendre villars sur ollon hedonia

Closer to the town center, the Hedonia building, completed in 2020, features 20 secondary-residence apartments and 4 commercial spaces.

  • All commercial spaces are successfully leased.
  • Of the 20 apartments, 16 have been sold, 3 are retained by the developers, and only one unit remains for sale: Apartment A9, a 3-bedroom, 124 m² apartment with two large terraces.

More details: https://www.turrian.ch/fr/N15511/hedonia-residence-alpine-a9.html

Other ongoing construction projects in Villars-sur-Ollon

5. Moghadam Campus Hub

Aiglon College Close up

Other projects include the renovation of the Moghadam Campus Hub by Aiglon College, set to open to students in 2026. Construction on “La Calèche” has just begun along the road in Chesières, while the “New Chantecler” building is undergoing public inquiry until November 24. These projects aim to provide high-quality facilities and maintain Aiglon’s position in the top 10 global schools.

6. Bridge at the Barboleuse Exit

The largest project, with an investment of nearly CHF 26 million for its first phase, is being managed by the State of Vaud in collaboration with TPC. This initiative aims to optimize and secure railway traffic between Barboleuse and Villars by constructing a bridge at the Barboleuse exit, expected to be completed by 2026.
For more details on upcoming phases, check out our article: “Ongoing Projects for Public Transport Improvements.”
Questions?
Our team is here to assist. Don’t hesitate to contact us at +41 24 495 95 95.